83 Years Ago – Construction Began in The Bay

361_SFBridge_1023_LowRes

Eighty-three years ago today (Jan. 5, 1933), construction began on the Golden Gate Bridge.

Joseph Baermann Strauss was appointed Chief Engineer for the Golden Gate Bridge project. His original bridge design was for a cantilever-suspension hybrid, but by the time it went into production, that design changed to the full-suspension bridge we all know.

When the bridge opened in 1937 it was the world’s longest suspension span (4,200 ft) over a straight deemed too treacherous to bridge. The Golden Gate straight proved  “bridgeable” after all and the bridge considered an engineering marvel. It links San Francisco with Marin County and is constantly bombarded with corrosive salt fog entering into San Francisco Bay from the Pacific Ocean.

All of the suspension cables were replaced in the mid-1970’s, after discovering many of them were highly corroded. The original paint replaced only a few times is now a water-borne inorganic zinc based primer with an acrylic topcoat, in the same orange vermilion (international orange) it has always been. It was never painted gold, because its name is for the straight it spans, not its color.

The Golden Gate Bridge has carried over two billion cars across its suspended steel framework since it opened May 28, 1937.

For more information on the bridge, please visit:   http://goldengatebridge.org/visitors/

Image registered with the U.S. Office of Copyright. Any use requires licensing from Martha Lochert.

www.MarthaLochertPhotography.com

%d bloggers like this: